Underpass

A safe underground path to the beach

Lanthia Resort’s pedestrian underpass connects the hotel to the pinewood and beach.

The project is technically complex and required a special study of the ground peculiarities.

The tunnel is made of curved corrugated steel sheets, the paving of granite cobblestones, and the ramp walls of reinforced concrete, whose finish recalls the excavated ground. The project included ad hoc vegetation to ensure continuity with the surrounding nature.

Years

  • 2010 - 2012

Location

  • Tancau (municipality of Lotzorai), Sardinia

Client

  • Me.De.As. S.r.L.

Assignment

  • Definitive project and working drawings, works supervision

Team

  • Luca Mereu

Consultants

  • Mattioli Associati (master planning), Salvatore Sannio (structure)